Hydrology, Vol. 11, Pages 67: Reconstruction of a Long-Term, Reach-Scale Sediment Budget Using Lateral Channel Movement Data as a Proxy: A Case Study on the Lowland Section of the Tisza River, Hungary

Humans have influenced the sediment transport of rivers on a centurial scale. Our goal was to use the rate of lateral channel processes as a proxy to reconstruct sediment budget (SB) changes of a lowland river (Middle Tisza, Hungary) on a historical scale (1838–2017). The gross sediment budget (GSB) refers to the total area of eroded and accumulated surfaces, and the net sediment budget (NSB) indicates the sediment sink or source characteristics. At the beginning (1838–1890), the artificial cut-offs increased the slope and channel erosion, but the eroded sediment deposited in the oxbows, so the reach acted as a sediment sink (NSB: +0.1–0.8 m2/m/y). Then (1890–1929), a quasi-equilibrium state developed (NSB: −0.2 m2/m/y to +0.4 m2/m/y). Later (1929–1976), the bank protections impeded lateral erosion, so the system became a sediment sink again (NSB: +0.1–0.7 m2/m/y). Finally (1976–2017), the erosional processes accelerated due to dam construction and revetment collapses, and now the river is a sediment source (NSB: −0.03 to −0.08 m2/m/y). This study proved that (1) the actual SB could not be projected in the long term, as it was heavily modified, and (2) lateral channel changes could be used as a proxy to estimate long-term SB.

May 15, 2024 - 14:37
 0  173
Hydrology, Vol. 11, Pages 67: Reconstruction of a Long-Term, Reach-Scale Sediment Budget Using Lateral Channel Movement Data as a Proxy: A Case Study on the Lowland Section of the Tisza River, Hungary

Hydrology, Vol. 11, Pages 67: Reconstruction of a Long-Term, Reach-Scale Sediment Budget Using Lateral Channel Movement Data as a Proxy: A Case Study on the Lowland Section of the Tisza River, Hungary

Hydrology doi: 10.3390/hydrology11050067

Authors: Tímea Kiss Marcell Tóth Gergely T. Török György Sipos

Humans have influenced the sediment transport of rivers on a centurial scale. Our goal was to use the rate of lateral channel processes as a proxy to reconstruct sediment budget (SB) changes of a lowland river (Middle Tisza, Hungary) on a historical scale (1838–2017). The gross sediment budget (GSB) refers to the total area of eroded and accumulated surfaces, and the net sediment budget (NSB) indicates the sediment sink or source characteristics. At the beginning (1838–1890), the artificial cut-offs increased the slope and channel erosion, but the eroded sediment deposited in the oxbows, so the reach acted as a sediment sink (NSB: +0.1–0.8 m2/m/y). Then (1890–1929), a quasi-equilibrium state developed (NSB: −0.2 m2/m/y to +0.4 m2/m/y). Later (1929–1976), the bank protections impeded lateral erosion, so the system became a sediment sink again (NSB: +0.1–0.7 m2/m/y). Finally (1976–2017), the erosional processes accelerated due to dam construction and revetment collapses, and now the river is a sediment source (NSB: −0.03 to −0.08 m2/m/y). This study proved that (1) the actual SB could not be projected in the long term, as it was heavily modified, and (2) lateral channel changes could be used as a proxy to estimate long-term SB.

What's Your Reaction?

like

dislike

love

funny

angry

sad

wow

Lema Kefyalew Studying a Ph.D. in Civil Engineering (Hydraulic Engineering). Studying Master of Project Management (MPM). Graduated with MSc in Civil Engineering (Hydraulic Engineering). Followed a 12 month Software Engineering program at ALX_Africa (Holberton school). Graduated with BA degree in Management. Graduated with BSc degree in Civil Engineering.